Electrophoresis
Oct 31, 2024| Electrophoresis
The process is divided into anode electrophoresis and cathode electrophoresis. If the coating particles are negatively charged and the workpiece is an anode, the coating particles are deposited into a film on the workpiece under the action of electric field force, which is called anode electrophoresis. Conversely, if the paint particles are positively charged, the workpiece is a cathode, and the coating particles are deposited on the workpiece into a film called cathode electrophoresis. The general process of anodic electrophoresis is: pre-treatment of the workpiece (oil removal → hot water washing → rust removal → cold water washing → phosphating → hot water washing → passivation) → anodic electrophoresis → post-treatment of the workpiece (clean washing → drying). 1. Remove oil. The solution is generally a hot alkaline chemical degreasing liquid, the temperature is 60℃ (steam heating), and the time is about 20min. 2. Wash with hot water. Temperature 60℃ (steam heating), time 2min. 3. Remove rust. With H2SO4 or HCl, such as with hydrochloric acid rust removal solution, HCl total acidity ≥43 points; Free acidity >41 points; Add 1.5% cleaning agent; Wash at room temperature for 10 ~ 20min. 4. Wash in cold water. Water with cold water for 1min. 5. Phosphating. With medium temperature phosphating (phosphating 10min at 60℃), the phosphating solution can be commercially available finished products. The above process can also be replaced by sandblasting → washing. 6. Passivation. Use the drugs that are matched with the phosphating solution (provided by the manufacturer that sells the phosphating solution) at room temperature for 1 to 2min. 7, anode electrophoresis. Electrolyte composition: H08-1 black electrophoretic paint, solid fraction 9% ~ 12%, distilled water mass fraction 88% ~ 91%. Voltage: (70±10) V; Time: 2 ~ 2.5min; Paint temperature: 15 ~ 35℃; Paint PH: 8 ~ 8.5. Note that the workpiece inlet and outlet slot should be powered off. In the process of electrophoresis, the current will gradually decrease with the thickening of the paint film. 8. Clean water. Wash in running cold water. 9. Dry. It can be baked in the oven at (165±5) ℃ for 40 ~ 60 minutes.
IKS PVD company, decorative coating machine, tools coating machine, DLC coating machine, optical coating machine, PVD vacuum coating line, the turn-key project is available. Contact us now, E-mail: iks.pvd@foxmail.com


