How To Clean And Purify The Screw Vacuum Pump

Mar 04, 2023|

    The inert gas or steam at 1 kg /cm2 pressure is connected to the valve. Close the intake valve, open the inflation valve, open the valve, start the pump, and run for about 30 minutes. Time depends on the accumulation of material in the pump. After stopping, rotate the pump by hand, whether it is smooth, smooth words to complete, not smooth words to repeat 2-3 times. Then close the air valve, start the pump and run for another 20 minutes. Empty the liquid in the pump until no liquid is discharged from the exhaust port. Stop the machine. Close the valve, start the pump, check the pump operation is normal. The cooling water should also be turned on. Dry screw vacuum pump empty operation, after the cleaning and purification process is completed, the pump needs to carry out 20-30 minutes of empty operation, in order to completely empty the residue in the pump, so as not to affect the next normal operation.

    IKS PVD company, decorative coating machine, tools coating machine, DLC coating machine, optical coating machine, PVD vacuum coating line, the turn-key project is available. Contact us now, E-mail: iks.pvd@foxmail.com

3

 

Send Inquiry