To clean an installed pump, follow the pump shutdown procedure:

Feb 24, 2022|

To clean an installed pump, follow the pump shutdown procedure:

 

1. Remove all water cooling lines and cut off the primary circuit power supply to the pump heater. 2. Release all pump oil. 3. Unscrew the inlet and front pipe connection bolts and remove the pump from the system. 4. Remove the water cooling cap (if applicable). 5. Remove the nozzle assembly in accordance with the method described in the operation manual of the specific pump model. 6. Carefully clean the inside of the pump body with acetone and flush with isopropyl alcohol. The pump is then blown dry with clean, dry, oil-free compressed air. 7. Carefully clean nozzle assembly with acetone. Wipe all surfaces with isopropyl alcohol and blow dry them with clean, dry, oil-free compressed air. 8. Reinstall the nozzle and water cooling cap to the pump body. Make sure the nozzle is properly aligned with the front stage system (if applicable). 9. Check the condition of o-rings. Replace o-rings that show any signs of aging or compression. 10. Connect the pump to the system.

Warning:
Do not use near a high-temperature source. Ventilate the work area with a fan and use a diffusion pump in a large well-ventilated room. Separate breathing apparatus can also be used if necessary.
Always ensure that cleaning operations are carried out in a large, well-ventilated room. Please wear goggles, gloves, and protective clothing.

motocycle parts coating

IKS PVD company, decorative coating machine, tools coating machine, DLC coating machine, optical coating machine, PVD vacuum coating line, the turn-key project is available. Contact us now, E-mail: iks.pvd@foxmail.com


Send Inquiry